The application required careful coordination of a range of planning and technical matters, including cultural heritage, fire safety, vegetation, waste management and site layout. As the land was located within an area of Aboriginal cultural heritage sensitivity, a Cultural Heritage Management Plan process formed an important part of the approval pathway, alongside the broader planning permit assessment.